As part of the Skills Development Plan (SDP), the Ministry of Labour and Human Resources will be conducting the following training:

Sl Course Slots Institute Location Certification Minimum Qualification Last date for Application Start Date Duration
1 Solar Power Technology 25 JWPTI Dekiling/Sarpang Institute Certificate 10 20/1/2022 1/2/2022 3 months
2 Tiles Laying (Upskilling) 25 JWPTI Dekiling/Sarpang Institute Certificate NC2-Mason/Basic skill on Mason 20/1/2022 1/2/2022 1 month

Logistics will provided. Interested job seekers are requested to submit their application online through https://mis.molhr.gov.bt/tvet/tvet/institute-nsd-trainee/3

 

For more information, please contact Ms. Namgay Wangmo at namgayw@molhr.gov.bt or 02-332607

Solar Power Technology :

Solar Technician Program prepares individuals to apply basic engineering principles and technical skills in support of engineers and other professionals engaged in developing solar powered energy systems. Course includes instruction in solar energy principles, energy storage and transfer technologies, testing and inspection procedures, system maintenance procedures, and report preparation.

Other topics include site analysis, system sizing, array configuration, and electricity basics; electrical design characteristics such as wiring, overcurrent protection, and grounding; a detailed look at module and inverter specifications and characteristics; mounting methods for various roof structures and ground mounts; and an introduction to safety, construction management, commissioning and more.

Tiles Laying (Upskilling):

After completing this programme, participants will be able to: • Gain insight into the Mason Tiling job role and its career progression: – General introduction to job role, role of a Mason Tiling in construction industry along with the future possible career development provisions.

• Lay and fix tiles both horizontally & vertically on wall and floor: -Selection and use of tools for measuring, marking, cutting, laying and fixing tiles as per standard procedure

• Apply grouts and sealants for flooring and cladding works: -Selection and use of different tools, equipment, grouts and sealants for sealing joints and finishing of flooring and cladding works.

• Work effectively in a team to deliver desired results at the workplace :- Organised working procedure within a team at site

• Plan and organize work to meet expected outcomes :- Prioritizing activities and organising resources to meet desired outcome • Work according to personal health, safety and environment protocol at construction site: -Importance of Health & Safety aspects & measures to be followed while working.